Project Name: TRNC Water Supply Project "Offshore Crossing Pipeline"

Client: DSİ ( General Directorate of State Hydraulic Works)

Contract: Procurement & Construction

Project Scope:

1). 80 km 1600mm dia HDPE Pipeline Offshore Crossing Pipeline including Landfall, On Bottom and Suspended Offshore Sections
2). İnstallation of 132 no's Anchors Blocks+ Tethers + Buoys up to -1430 meter WD
3). Commissioning of Pipeline

Year: 2012 to 2015

Service Provided: Project Management & Execution. 

02

Project Name: TANAP Natural Gas Pipeline Project Onshore Section Lot-4

Client: TANAP A.S. | Owners Engineer : Worley

Contract: Procurement & Construction

Project Scope:

  • 459 km 48" Country Crossing Onshore Natural GAS Pipeline

  • 14 no's of Block Valve Stations

  • 4 Nos of Pigging Stations

  • 2 Nos of HDD Crossings

Year: 2015 to 2018

Service Provided: Project Management - Executive Board Committee Member of  Project Joint Venture 

03

Project Name: TANAP Natural Gas Pipeline Offshore Crossing Project Lot-5

Client: TANAP A.S. | Owners Engineer : Worley

Contract: Engineering, Procurement & Construction (EPC)

Project Scope:

  • 2x36" 17,7 km Offshore Pipeline and Umbilical including CWC Pipe Supply, Umbilical Supply, Beach Pull,

  • Trenching & Backfilling, Logistic & Permits

Year: 2015 to 2018

Service Provided: Project Management - Executive Board Committee Member of  Project Joint Venture 

04

Project Name: Etki Liman FSRU Terminal EPC Project

Client: BOTAS (Petroleum Pipeline Coop. Turkey)

Contract: Engineering, Procurement & Construction (EPC)

Owners Engineer : Worley

Project Scope:

  • FSRU LNG Terminal Project with 20 million/day Sm3 Send-Out capacity

Year: 2015 to 2018

Service Provided: Project Management - Engineering & Procurement Management

05

Project Name: Kuzey Marmara Underground Gas Storage Project (Phase 3)

Client: BOTAS (Petroleum Pipeline Coop. Turkey)

Contract: Engineering, Procurement & Construction (EPC)

Owners Engineer : Petrofac -TSE JV

Project Scope:​

Onshore

  • New Surface Plants (50 million Sm3 /day Production Capacity)

  • Onshore Pipeline (36", 28" and 24" diameters)

Offshore

  • Two Unmanned Offshore Platforms (Jackets + Topsides , Subsea Pipeline (2x 28") and Subsea Cable

  • Offshore Drilling (18 no's of Directional Drilled Wells),

  • Decommissioning of existing Platform & Pipeline

​Year: 2019 to Present

​Service Provided: Project Management - Project Director

bottom of page